Greater City Concrete Works Ltd. | Concrete Forming & Placing

Building Northern Ontario from Excavation to Anchor Bolts
Building Northern Ontario from Excavation to Anchor Bolts

INDUSTRIAL

INFRASTRUCTURE

INSTITUTIONAL

INDUSTRIAL

INFRASTRUCTURE

INSTITUTIONAL

OUR STORY

GCCW was founded in 2007 in Lively, Ontario, with the objective of delivering concrete forming and placing services to the local industrial, commercial and institutional construction markets.

WHY CHOOSE US?

Our Mission

Sustainable construction to benefit you and your community.

Vision

Construct a sustainable world.

Values

Passionate, honest, fair, ethical, solution-oriented, economically, environmentally sustainable, team development & lifetime valued relationships.  

NEED HELP? CONTACT US ANYTIME

WE ARE ALWAYS READY TO HELP

OUR CAPABILITIES

What We're Good At

GENERAL CONTRACTING

At GCCW we know how challenging it can be to bring together all facets of the project to make it a successful one.

PROJECT MANAGEMENT

GCCW has broadened its scope into project management, expanding our capabilities for the projects we handle.

FORM WORK

GCCW uses form systems that are engineered to provide only the right method for each framework project.

POURING CONCRETE

Since GCCW began, we have honed our craft at pouring quality concrete, with a network of industry experts who got us here.

EXCAVATION

GCCW has recently hired a team of equipment operators to supplement our construction team.

SPECIALTY SERVICES

Aside from the big tasks, GCCW offers a variety of specialty services for our valued client’s needs.

FEATURED PROJECTS

Some Of Our Recent Work

Flour Mill Museum Relocation

Constructed new concrete building foundations at relocation site. Moved two existing heritage buildings from their former site to the newly developed/relocation site. Installed electrical services and modified the storm sewer system at relocation site. Constructed a new stamped concrete pad and installed new decks around heritage buildings once they were moved into new location.

PGP Phase 2 Secondary Off-Gas Foundations

Supplied, poured and cured concrete (piles and foundations) for the secondary fan building, bent 2A and conveyor flue foundation reinforcing, oil storage, secondary duct, and stack. Supplied, installed and removed formwork and scaffolding as required. Detailed, fabricated, supplied and installed reinforcing, embeds and anchor bolts as required. Project Management included subcontracting out electrical, structural steel and earthworks.

Wesdomes Eagle River Mine Fresh Air Raise

Provided excavation and backfill for foundations including granular supply. Formed and poured concrete foundations for heater house, fan, discharge cone, large transition, small transition and elbow with reinforcing. Supplied and installed anchor bolts for fan, discharge cone, large transition, small transition and elbow foundations.

Scaffold Access

Provided scaffold access around a cone shape vessel. Supplied all supervision, labour, material and total system scaffolding components as required and identified on job specific site visit. Material delivery to respective workplaces.

Boiler Foundations

Excavation, backfill, form and rebar provided for new concrete foundations. Installed two new door penetrations in block wall, and one new set of stairs. Moved two existing set of stairs and some existing handrails.

Forming of Concrete Grade Beams

Supplied and installed formwork required for Block 1, 2, 3 and 4, as well as formwork needed for grade beams. Concrete placed and finished as required for Block 1, 2, 3 and 4, as well as grade beams and slab.
Building Northern Ontario from Excavation to Anchor Bolts

LEARN MORE ON OUR BLOG

Industry News, GCCW Projects & Career Opportunities

FOLLOW US ON SOCIAL MEDIA

TESTIMONIALS

What Our Clients Have To Say

THE PATRICK GROUP OF COMPANIES