GCCW Limited | Construction Solutions

Let’s Connect!

Building Northern Ontario from Excavation to Anchor Bolts

Building Northern Ontario from Excavation to Anchor Bolts

INDUSTRIAL

INFRASTRUCTURE

INSTITUTIONAL

OUR STORY

 

Founded in 2007 in Lively, Ontario, GCCW began with a commitment to providing top-quality concrete forming and placing services for industrial, commercial, and institutional construction markets. Over the years, we’ve expanded our reach, proudly serving clients across Canada with expertise and dedication on projects of all sizes and complexities.

WHY CHOOSE US?

Our Mission

Sustainable construction to benefit you and your community.

Vision

Construct a sustainable world.

Values

Passionate, honest, fair, ethical, solution-oriented, economically, environmentally sustainable, team development & lifetime valued relationships.  

INDUSTRIAL

INFRASTRUCTURE

INSTITUTIONAL

Need Assistance?

Contact Our GCCW Team Anytime!

OUR CAPABILITIES

What We're Good At

PROJECT MANAGEMENT

We oversee your project from start to finish and offer winter solutions like heated formwork and insulated curing.

SCAFFOLDING AND ACCESS

We provide systems to ensure worker safety and efficiency in all construction environments.

INFRASTRUCTURE

We build and upgrade utilities, storm sewers, and heavy foundations for industrial and municipal projects.

CONCRETE SOLUTIONS

We provide formwork, pouring, finishing, and reinforcement to build strong and reliable concrete structures.

SITE PREP AND FOUNDATIONS

Our team handles excavation, grading, and foundation construction for industrial and institutional projects.

GCCW delivers high-quality epoxy flooring tailored to your project’s specific needs.

FEATURED WORK

Flour Mill Museum Relocation

Constructed new concrete building foundations at relocation site. Moved two existing heritage buildings from their former site to the newly developed/relocation site. Installed electrical services and modified the storm sewer system at relocation site. Constructed a new stamped concrete pad and installed new decks around heritage buildings once they were moved into new location.

PGP Phase 2 Secondary Off-Gas Foundations

Supplied, poured and cured concrete (piles and foundations) for the secondary fan building, bent 2A and conveyor flue foundation reinforcing, oil storage, secondary duct, and stack. Supplied, installed and removed formwork and scaffolding as required. Detailed, fabricated, supplied and installed reinforcing, embeds and anchor bolts as required. Project Management included subcontracting out electrical, structural steel and earthworks.

Wesdomes Eagle River Mine Fresh Air Raise

Provided excavation and backfill for foundations including granular supply. Formed and poured concrete foundations for heater house, fan, discharge cone, large transition, small transition and elbow with reinforcing. Supplied and installed anchor bolts for fan, discharge cone, large transition, small transition and elbow foundations.

Scaffold Access

Provided scaffold access around a cone shape vessel. Supplied all supervision, labour, material and total system scaffolding components as required and identified on job specific site visit. Material delivery to respective workplaces.

Boiler Foundations

Excavation, backfill, form and rebar provided for new concrete foundations. Installed two new door penetrations in block wall, and one new set of stairs. Moved two existing set of stairs and some existing handrails.

Forming of Concrete Grade Beams

Supplied and installed formwork required for Block 1, 2, 3 and 4, as well as formwork needed for grade beams. Concrete placed and finished as required for Block 1, 2, 3 and 4, as well as grade beams and slab.

LEARN MORE ON OUR BLOG

Industry News, GCCW Projects & Career Opportunities

TESTIMONIALS

GET IN TOUCH WITH OUR TEAM

Connect with us on social media or reach out through the form below.

THE PATRICK GROUP OF COMPANIES